MANGANESE MINING

Bolt Mineração

+ 0

Years of Experience

Geological Expertise

100% Regulated Concessions

Socio-Environmental Commitment

Trator de Mineração Bolt

THE COMPANY

About Us

Bolt Mineração is a 100% domestically owned company, dedicated to sustainable exploration and the development of the manganese deposit at the Tabocão Project. Strategically located in Rio dos Bois – Tocantins, Brazil, we combine deep technical knowledge with management focused on results and responsibility.

Geological Expertise

Team with over 30 years of experience in mineral exploration in Brazil and abroad, ensuring precision and safety throughout all production stages.

MANGANESE DEPOSIT

Tabocão Project

Located in a privileged sedimentary environment, the Tabocão Project operates with superficial eluvial-colluvial Hollandite deposits. Bolt’s great competitive advantage is the implementation of Ore Sorter technology — we are pioneers and the only manganese mining company in Brazil to use this automated sorting system. This ensures a final product of superior purity and maximum operational efficiency in surface extraction.

 

Geology and Deposit: Simplicity that Generates Profit

  • Nature of the Deposit: Superficial eluvial-colluvial Hollandite mineralization.
  • Mining Method: Extraction by scarification (ripping), a process of very low operational complexity and reduced cost.
  • Thickness and Grade: The ore is coarse (slabs and blocks), with an average thickness of 0.5m and an average Manganese (Mn) grade of 40.91% in the main body.
Trator de Mineração Bolt

13.002ha

Concession Hectares

426ha

Deposit Hectares

40,91%

Average Mn Grade

0,50m

Average Thickness

INFRASTRUCTURE

LOCATION AND LOGISTICS

The Tabocão Project is located near Fortaleza do Tabocão, in the State of Tocantins, with excellent access infrastructure and logistics for production transport.

Expansion Potential

  • Additional Targets: Identification of 10 new smaller targets already inspected, representing immediate additional potential.
  • Resource Optimization: The 5 to 12 mm particle size range — not yet accounted for in official resources — represents extra potential for expanding the deposit.

Location

Along the banks of the BR-153 highway, 150 km from Palmas and 5 km from Fortaleza do Tabocão.

Road Access

990 km to the Port of Vila do Conde in Barcarena, via paved highway.

North-South Railway

Proximity to the North-South railway, facilitating production outflow.

Electricity

High-voltage transmission line crosses the concessions.

LEARN MORE

Contact Us

We are ready to present the opportunities of the Tabocão Project and provide high-quality mineral solutions for your demands.

Direct Support Channel

Formulário de Contato - LP Bolt PT
Bolt Mineração

Contact Us